
BeforeAfterDrag to compare
Full renovation of an 85 m² apartment
Complete redistribution, new electrical and plumbing installation, continuous porcelain flooring and an open-plan kitchen-living room.
- Location
- Torrevieja
- Duration
- 9 semanas / 9 weeks

Projects
Filter by type of work and drag each image to reveal the before and after of our renovations.

BeforeAfterDrag to compare
Complete redistribution, new electrical and plumbing installation, continuous porcelain flooring and an open-plan kitchen-living room.

BeforeAfterDrag to compare
Bathtub replaced with a shower tray, large format tiles, wall-hung vanity and indirect LED lighting.

BeforeAfterDrag to compare
Partition wall removed, new bespoke units, integrated appliances and upgraded ventilation.

BeforeAfterDrag to compare
Crack repair, single-coat render, waterproofing and elastic paint resistant to sea salt.

BeforeAfterDrag to compare
New lining, anti-slip porcelain coping, LED lighting and a renewed filtration system.

BeforeAfterDrag to compare
Complete fit-out with air conditioning, track lighting, a new shopfront and installation certificate.

BeforeAfterDrag to compare
Aluminium structure, technical outdoor decking, weatherproof sockets and approved technical project.
Tell us what you want to renovate and you will receive a detailed, no-obligation quote within 48 working hours.